Cooling Tower Engineering Tools
Use ThermoCore tools to prepare early-stage cooling calculations, collect project data and speed up technical communication before equipment selection.
Engineering tools for cooling projects
Start with wet-bulb temperature checks and project data preparation. More calculators can be added here as dedicated tools.
Wet Bulb Temperature Calculator
Estimate wet-bulb temperature from dry-bulb temperature, relative humidity and atmospheric pressure for cooling tower preliminary checks.
Planned tool
Cooling Tower Selection Helper
Prepare the key operating data needed for cooling tower or evaporative condenser selection before sending an RFQ.
Template in preparation
Unit Conversion Tools
Quick conversions for flow rate, heat load, temperature, pressure and common HVAC or industrial cooling units.
Planned tool
Before using cooling calculators
The quality of a calculation depends on the operating data. These notes help buyers and engineers prepare the right inputs.
What data should I prepare for wet-bulb calculations?
Prepare dry-bulb temperature, relative humidity, atmospheric pressure or project altitude. For equipment selection, also include water flow rate, inlet and outlet temperatures and project location.
Can calculator results replace a formal cooling tower selection?
No. Online tools are useful for early checks, but final selection should be reviewed with the actual heat load, site conditions, water quality, redundancy requirements and installation limits.
Will ThermoCore add more engineering tools?
Yes. This page is designed as a tools hub, so additional calculators and selection helpers can be added as the Resource library grows.
Need a formal cooling tower recommendation?
Send us your heat load, flow rate, inlet and outlet temperatures, wet-bulb condition and project location — our engineers will review the duty and recommend suitable equipment.